Application

In the process of pipe pile production, it is necessary to place the pipe pile mould quickly and accurately in the position of each process of pipe pile production. In order to overcome the inertia of the hanger, the steel mold of the pipe pile is positioned by manual control of the rope in the traditional pipe pile production, which not only has great labor intensity but also has low production efficiency. At the same time, the pipe pile will inevitably shake during the lifting process. In order to solve the above problems, we have developed a new type of special pipe pile crane with precise positioning, non-shaking and high production efficiency. The excellent quality has been well received by customers.

  1. Mould
  2. Thermoelectricity
  3. Food / medicine
  4. Metallurgy
  5. construction machinery
  6. Prefabricated component

2018 © EUROCRANE . All rights reserved. Zhejiang xiecheng hoisting machinery co. LTD 浙ICP备18029669号 XMLsitemap

销售热线:189-5730-9996 / 0573-84772000

浙公网安备 33042102000675号

采购名片

公众号